Compare USD 420 and USD 444
A: 350 linehaul + 50 fuel + 20 liftgate = 420. B: 320 + 20% of 320 + 60 = 444. The matched difference is 24.
Compare the whole offer. Check the margin before you quote.
Compare freight quotes with clear charges and service terms. Calculate broker margin, markup and target selling prices, with formulas and worked examples.
Free to use · no signup · calculations stay in your browser
Miami, FL 33166 → Atlanta, GA 30303 · 2026-11-10 · LTL · commercial delivery
Snapshot 2026-11-06T09:00 · UTC-05:00 · USD
EX-A-006 · 3 business days · estimated
EX-B-006 · 2 business days · estimated
Offer A is USD 24.00 lower for the matched scope.
Blue linehaul · orange fuel · green planned services
| Charge | Offer A · USD | Offer B · USD |
|---|---|---|
| Quoted linehaul | 350.00 | 320.00 |
| Linehaul floor top-up | 0.00 | 0.00 |
| Fuel | 50.00 | 64.00 |
| Liftgate | 20.00 | 60.00 |
| Appointment | Included in another charge | Included in another charge |
| Additional planned service | Not applicable to the offer | Not applicable to the offer |
| Quoted total | 420.00 | 444.00 |
Planned services describe the supplied quotes. Changes, waiting, reweigh or reclassification can change the invoice.
Open private margin calculator
Apply a quoted linehaul floor before calculating percentage fuel. The floor changes linehaul only.
Apply a quoted linehaul floor before calculating percentage fuel. The floor changes linehaul only.
Cost base C · selling price S · selected additional direct expenses K. Count each direct cost once.
Manually entered cost base · USD
Contribution rate 12.00% of sell. Overhead and tax are outside this selected-cost measure.
Match both offers on lane, pickup, cargo, handling and required accessorials. Confirm each quote covers the shared request.
Enter linehaul, the quoted fuel basis, any linehaul floor and planned services. Keep accept-by times and transit terms with the source.
Select the snapshot and offsets. Resolve missing fees and scope differences. For mixed currencies, supply the FX rate, date and source.
Choose a cost base, add the customer sell and enter costs outside the base. Preview the customer copy separately from the internal comparison.
Compare the same cargo, dates and services. Terminal pickup and door delivery are different scopes. Bundles must name their priced parent.
Apply a linehaul-only floor before the sample percentage fuel calculation. Enter a flat fuel amount when the quote uses another base and you have calculated the charge.
Accept-by is inclusive. Transit remains estimated unless the provider expressly guarantees it. Manual FX converts the source total once.
Gross profit = sell − cost. Gross margin divides profit by sell. Markup divides profit by cost. Selected-cost contribution subtracts the additional direct costs outside the cost base.
Divide cost by (1 − target margin), multiply cost by (1 + target markup), or divide cost plus additional expenses by (1 − target contribution). Round the required sell up to the next cent if needed.
A: 350 linehaul + 50 fuel + 20 liftgate = 420. B: 320 + 20% of 320 + 60 = 444. The matched difference is 24.
B shows a known subtotal of USD 384. A missing required charge keeps the full comparison open.
B becomes 400 + 80 fuel + 60 liftgate = USD 540.
EUR 400 × a manually sourced example rate of 1.10 USD/EUR = USD 440.
With USD 420 cost and USD 500 sell, gross profit is 80, gross margin is 16%, and markup is 19.05%.
At USD 420 cost, a 20% margin requires USD 525. A 20% markup requires USD 504.
An additional USD 20 of direct expenses leaves USD 60 contribution on a USD 500 sell. At USD 400 sell, gross profit is −20 and contribution is −40.
Check the same shipment assumptions, included services, fuel basis, validity and estimated or guaranteed transit.
The known subtotal stays visible. Resolve the charge or confirm its inclusion or exclusion before using a complete quote total.
Confirm the exact charge base. This sample applies percentage fuel to linehaul after the linehaul floor.
Enter the direction, rate, date and source for manual FX. The calculator preserves the source amounts and compares converted totals.
Margin expresses gross profit as a share of selling price. Markup expresses the same profit as a share of cost.
A downward cent-rounding could leave the achieved rate below the target. At USD 100 cost and 25% margin, USD 133.34 meets the target.
The shipment details, customer price, customer quote reference, customer-facing transit and acceptance terms. Use the internal export to keep the underlying charges and pricing assumptions.
Reweighs, classification changes, waiting time or new services can change the invoice. Check the carrier’s actual terms before booking.